The European Union finds itself at a critical juncture in the race against climate change. The ambitious targets set for 2030 and 2050 demand swift and effective energy actions, including wind power development. With barriers such as technical complexities, social resistance, and environmental concerns, the EU and its Member States cannot afford further delays and lessons must be learned from past failures.

JustWind4All and WIMBY addressed these challenges during a European Sustainable Week (EUSEW) session titled “The answer is in the wind: the Accele-Res initiative for a holistic approach to wind power.” To streamline the path for wind energy projects, the Accele-RES Initiative introduces Renewables Acceleration Areas (RAAs). The success of RAAs depends heavily on their design and the degree of stakeholder collaboration. Member States have to adopt a comprehensive planning approach, considering technical, environmental, and social factors, and actively involve citizens in RAA implementation. Moreover, ecosystem-based spatial planning is essential for mitigating environmental impacts and advancing the EU’s climate goals.

By bringing together a diverse group of stakeholders, including the wind industry, NGOs, policymakers, and researchers, the policy session provided a platform to explore the complexities of Accele-RES implementation. A panel discussion with five speakers focused on the challenges and opportunities for Member States to designate and implement Accele-RES for onshore and offshore wind energy in a holistic manner, ensuring benefits for both communities and nature

To start this conversation, we brought together EU and local perspectives from the wind industry, NGOs, policymakers, and researchers:

  • Adolfo Camposarcone: Policy Officer at the Regione Puglia Office
  • Carla Freund: Policy Officer for Climate and Environmental Policy in Europe at NABU (Naturschutzbund Deutschland eV)
  • Elif Gündüzyeli: Director of Renewable Energy Program, Europe at The Nature Conservancy
  • Stavroula Pappa: Policy Advisor at http://REScoop.eu
  • Amanda Schibline, MBA: Manager, Socio-Energy Systems at Renewables Grid Initiative
  • Guy Willems: Advisor for Environment and Community Engagement at WindEurope
  • Julia Wittmayer: Associate Professor at DRIFT, Erasmus University Rotterdam

About ACCELE-RES:

The Accele-RES initiative is a program aimed at accelerating the development and deployment of renewable energy sources, particularly wind power, within the European Union. It introduces the concept of Renewables Acceleration Areas (RAAs), which are designated zones optimized for the efficient and rapid development of renewable energy projects. The initiative focuses on creating a streamlined and holistic approach to wind energy, addressing technical, environmental, and social factors. By involving various stakeholders, including industry experts, NGOs, policymakers, and researchers, Accele-RES seeks to overcome barriers such as technical complexities, social resistance, and environmental concerns to advance the EU’s climate objectives and meet ambitious energy targets for 2030 and 2050.

Our panel discussed various topics around ACCELE-RES and wind deployment. Read the short summary of key discussion points considered at our session:

IMPACT ASSESSMENTS in the WIND SECTOR

  • Data Availability: Data is crucial but often resides within companies in various formats, making it difficult to access and use effectively.
  • Cumulative Impacts: Evaluating cumulative impacts is challenging. Risks and opportunities often become apparent too late, typically after Environmental Impact Assessments (EIAs) are completed, leaving little time to address, mitigate, or alter projects or plans.
  • Interdisciplinary Collaboration: There needs to be improved collaboration and communication across different disciplines to enhance project outcomes.
  • Tool Interoperability: Existing digital tools should be better connected and interoperable to streamline processes and improve efficiency.‌

ENVIRONMENTAL IMPACTS

  • Learning from Past Mistakes: Avoid repeating past mistakes; nature needs adequate space to thrive.
  • Sensitivity Mapping: While sensitivity mapping is a good start, its adoption is low. Data needs to be more available and accessible since areas to avoid are not always known.
  • Restoration and Preservation: Restoration and preservation of ecosystems and biodiversity should be integrated with acceleration measures to ensure sustainable progress.
  • Harmonizing EIAs: More harmonization is needed across countries for Environmental Impact Assessments (EIAs) to make them easier to navigate. However, achieving standardization is challenging due to the diverse legal and regulatory frameworks, permitting procedures, constraints, and decision-making processes.
  • European Solutions: Emphasize the need for European solutions to leverage our interdependence effectively, rather than creating further divisions between countries or regions.

LOCAL PARTICIPATION and ENERGY COMMUNITIES

  • Local Ownership: The guidance document includes provisions for local ownership, ensuring maximum benefits for communities and local levels.
  • Early Local Participation: Local participation should begin early, during the planning stage of projects.
  • Monitoring RAAs: Assess the performance of Regional Assessment Areas (RAAs) to ensure they are truly holistic.
  • Local Engagement: Define when, how, and to what extent local communities should be engaged.
  • Developer Benefits: Developers benefit from engaging with communities likely to be affected during the auctioning phase, as this helps de-risk the projects.
  • Activating the Local Economy: While siting can boost the local economy, RAAs designate areas but do not specify projects.
  • Balancing Engagement: Find a balance between effective engagement and preventing community fatigue or burden.
  • Offshore Engagement Clarity: Clarify who needs to be engaged for offshore projects.
  • Increased Staffing Needs: Public offices will need 2.5 times more full-time equivalent (FTE) positions to designate areas and properly involve citizens. Local institutions, such as those in the Puglia Region, lack the manpower and financial resources to meet these needs. Ensuring proper participation and training of office employees in technical, legal, social, and participatory aspects requires capacity building, which is currently underfunded. Although this is a necessary cost, it is difficult to cover with existing resources.
  • Defining KPIs: Establish proper Key Performance Indicators (KPIs) to monitor progress in participation and acceptance. These KPIs should be used by organizations, developers, local institutions, and policymakers to track progress, identify best and worst practices, and compile lessons learned.

ACCEPTANCE

  • Ownership of Social Buy-in: Identify who is responsible for securing social buy-in.
  • From Opposition to Pride: Transition from opposition to pride by considering shared ownership and decision-making power. Merely providing cost savings and compensation is insufficient; we need to rethink and acknowledge/reward community contributions meaningfully.
Go to Top